Incentive
  • 50% of total equipment and electric service installation costs up to $250 for non-managed chargers.
    • 50% of equipment cost up to $125
    • 50% of electric service installation cost up to $125.
  • 50% of total equipment and electric service installation costs up to $1,000 for managed chargers.
    • (Must be enrolled in MVEA’s TOD rate to qualify)
    • 50% of equipment cost up to $500.
    • 50% of electric service installation cost up to $500.
Qualifying Installations
  • Residential (limit two chargers per member account per year).
  • Commercial (private fleet).
  • Public (no fees for energy).
Product & Application Requirements
  • All equipment and installation costs are required to be on one application to be eligible for the full rebate amount.
  • EVSE manufacturer and model number identification.
  • Itemized receipt, including a breakdown of equipment and labor.
  • Attach photo(s) of installation including charger and electrical service.
Product Guidelines
  • It is the responsibility of the installer to ensure that all local and national building and electrical codes are met.
  • Managed programs include member system-led demand response control or time of use rate.
Incentive
  • 50% of EV charging equipment and electric service installation costs up to $1,000.
Qualifying Installations
  • Must be accessible to the general public; private installations do not qualify.
Product & Application Requirements
  • All equipment and installation costs are required to be on one application to be eligible for full rebate amount.
  • EVSE manufacturer and model number identification.
  • Itemized receipt, including breakdown of equipment and labor.
  • EV charging equipment is required to be network-capable.
  • One rebate per installed charger; multiple charge connectors/ports associated with a single charger do not qualify for multiple rebates.
  • Attach photo(s) of installation including charger and electrical service.
Incentive
  • 50% of EV charging equipment and electric service installation costs up to $3,000 for 50 – 75 kW maximum station output.
  • 50% of EV charging equipment and electric service installation costs up to $5,000 for 76 – 149 kW maximum station output.
  • 50% of EV charging equipment and electric service installation costs up to $7,500 for 150 & above kW peak output.
Product & Application Requirements
  • All equipment and installation costs are required to be on one application to be eligible for full rebate amount.
  • Publicly accessible installations only.
  • Proprietary technology (IE – Tesla) requires pre-approval from program staff and will be limited to 50% of rebate value.
  • EVSE manufacturer and model number identification.
  • Itemized receipt, including breakdown of equipment and labor.
  • One rebate per installed charger; multiple charge connectors/ports associated with a single charger do not qualify for multiple rebates.
  • Attach photo(s) of installation including charger and electrical service.
Product Guidelines
  • It is the responsibility of the installer to ensure that all local and national building and electrical codes are met.
  • EV charging equipment is required to be network-capable.
  • One rebate per installed charger; multiple charge connectors/ports associated with charger do not qualify for multiple rebates.
  • Maximum station output is defined by a single charger output, and excludes paired charger/inverter design construction.
  • Must be an MVEA member.
  • Rebate requests take 4-8 weeks to process and will reflect on your MVEA bill as a credit.
  • Rebates are for new product purchases only.
  • Applications must be submitted within 90 days of purchase date.
  • You must provide an itemized sales receipt showing the model number, proof of payment, and the breakout of equipment and labor if applicable.
  • A photo of installation including charger and electrical service is required.
  • Rebate program and products are subject to change at any time without notice
You May Qualify for a Higher EV Charger Rebate if your household is 80% to 150% of Area Median Income levels for your County or participate in programs such as LEAP, SNAP, WIC, SSI, or other qualifying assistance programs. Scan the QR code on the form and if you qualify simply complete the Household Income Attestation Form and attach it to your rebate application.
  • Fill out the online application by clicking the button below. 
  • Upload all receipts and, if applicable, photos showing proof of installation to the online rebate form.