2022 Annual Meeting Door Prize Winners
Sundowner Prizes $500 Diana Jolly, Hugo $300 Steven Mease, Limon $200 Carla Stone, Limon 55 inch VIZIO Smart TV donated by Foothills Energy Service, Inc. Alexander Brown, Monument EGO Power+ 18” Cordless Electric Chainsaw donated by Tri-State Generation and Transmission…
Prior Year’s Annual Meeting Information
2023 Annual Meeting Program, Minutes, and Financial Report (PDF). 2023 Annual Meeting Presentation (PDF) 2023 Annual Meeting Door Prize Winners (PDF)
Annual Meeting of Members
Save the Date: 2027 Annual Meeting of Members Save the Date: 2027 Annual Meeting of Members Your perspective is important! As a Mountain View Electric Association, Inc. member, we invite you to share it with the co-op during our 86th…
Grassroots Network
Grassroots Network
Important Dates
2026-12-24 00:00:00 2026-12-24 00:00:00 2026-12-24 00:00:00 2026-12-24 00:00:00 2026-04-21 00:00:00 2026-04-21 00:00:00 , , Office Closure Office Closure
By-laws
By-laws-web By-laws-web
Unclaimed Capital Credits
Since 2013, Mountain View Electric Association’s (MVEA) Board has used a hybrid first-in, first-out (FIFO) 80% with a last-in, first-out (LIFO) 20% capital credits retirement system to increase the number of checks issued to members. Prior to 2013, capital credits were retired…
Will there be a new pole on my property?
Only if existing infrastructure needs to be replaced or upgraded. MVEA’s electric distribution system, including more than 6,200 miles of energized line and 24 substations, regularly receives scheduled upgrades and maintenance as part of our focused effort to provide safe…
How is the fiber line going to be installed, underground or above ground?
While there may be exceptions, generally, it will follow our existing electric distribution infrastructure. Underground fiber infrastructure will be built using bores and trenching Overhead fiber lines will be installed on existing above-ground electrical infrastructure (below our electric lines).
Why does MVEA need a new easement if they already have an existing easement?
MVEA is updating their package of rights to install fiber in the existing easement area and is asking for a voluntary easement before exercising Colorado’s broadband Easements Statute.

